US Bridges

IH30 WB to 360 NB over EB Cd Ave H NB Ft RD

Good

Tarrant County, Texas · 0.8 Mi. W. of Great SW Pk · Structure no. 022200106802553

Built
2017
8 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
1,821 ft
2 main spans
Daily traffic
7,000
2015 count
Owner
State
State Highway Agency

About this bridge

IH30 WB to 360 NB over EB Cd Ave H NB Ft RD is a steel continuous stringer/multi-beam or girder carrying IH30 WB to 360 NB over EB Cd Ave H NB Ft RD in Tarrant County, Texas. It was built in 2017, so it is 8 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,000 vehicles a day, roughly 8% of them trucks, projected to reach 9,200 by 2035. The structure is 1,821 ft (555 m) long and 28 ft wide.

CarriesIH30 WB to 360 NB
CrossesEB Cd Ave H NB Ft RD
Location0.8 Mi. W. of Great SW Pk
RouteInterstate 30
StateTexas
Coordinates32.75977, -97.05963
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2 (+14 approach)
Design loadHL 93
Structure length1,821 ft (555 m)
Longest span186 ft (56.7 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deck17 ft (5 m)

Traffic and service

Average daily traffic7,000 (2015)
Projected traffic9,200 by 2035
Trucks8%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH30 WB to 360 NB over EB Cd Ave H NB Ft RD built?

It was built in 2017, making it 8 years old in 2025.

What condition is IH30 WB to 360 NB over EB Cd Ave H NB Ft RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does IH30 WB to 360 NB over EB Cd Ave H NB Ft RD carry?

About 7,000 vehicles per day (2015 count), of which roughly 8% are trucks.

How long is IH30 WB to 360 NB over EB Cd Ave H NB Ft RD?

The structure is 1,821 ft (555 m) long with a longest span of 186 ft (56.7 m) and a deck 28 ft wide.

Who owns IH30 WB to 360 NB over EB Cd Ave H NB Ft RD?

It is owned by the State Highway Agency.