US Bridges

IH 30 EB on Ramp over IH 30 EB Exit Ramp

Good

Tarrant County, Texas · 0.2 MI E of FM 157 · Structure no. 022200106802491

Built
2011
14 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
1,000 ft
9 main spans
Daily traffic
50
2009 count
Owner
State
State Highway Agency

About this bridge

IH 30 EB on Ramp over IH 30 EB Exit Ramp is a prestressed concrete stringer/multi-beam or girder carrying IH 30 EB on Ramp over IH 30 EB Exit Ramp in Tarrant County, Texas. It was built in 2011, so it is 14 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 100 by 2029. The structure is 1,000 ft (304.8 m) long and 28 ft wide.

CarriesIH 30 EB on Ramp
CrossesIH 30 EB Exit Ramp
Location0.2 MI E of FM 157
RouteState Highway 30
StateTexas
Coordinates32.75932, -97.09216
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans9
Design loadHL 93
Structure length1,000 ft (304.8 m)
Longest span114 ft (34.7 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2009)
Projected traffic100 by 2029
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 30 EB on Ramp over IH 30 EB Exit Ramp built?

It was built in 2011, making it 14 years old in 2025.

What condition is IH 30 EB on Ramp over IH 30 EB Exit Ramp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does IH 30 EB on Ramp over IH 30 EB Exit Ramp carry?

About 50 vehicles per day (2009 count).

How long is IH 30 EB on Ramp over IH 30 EB Exit Ramp?

The structure is 1,000 ft (304.8 m) long with a longest span of 114 ft (34.7 m) and a deck 28 ft wide.

Who owns IH 30 EB on Ramp over IH 30 EB Exit Ramp?

It is owned by the State Highway Agency.