FM 157 NB over Trinity River Relief
GoodTarrant County, Texas · 2.1 MI S of SH 10 · Structure no. 022200074703051
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 756 ft
- 7 main spans
- Daily traffic
- 14,395
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
FM 157 NB over Trinity River Relief is a prestressed concrete stringer/multi-beam or girder carrying FM 157 NB over Trinity River Relief in Tarrant County, Texas. It was built in 2003, so it is 22 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 14,395 vehicles a day, roughly 3% of them trucks, projected to reach 23,330 by 2033. The structure is 756 ft (230.4 m) long and 49 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 157 NB over Trinity River Relief built?
It was built in 2003, making it 22 years old in 2025.
What condition is FM 157 NB over Trinity River Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does FM 157 NB over Trinity River Relief carry?
About 14,395 vehicles per day (2024 count), of which roughly 3% are trucks.
How long is FM 157 NB over Trinity River Relief?
The structure is 756 ft (230.4 m) long with a longest span of 108 ft (32.9 m) and a deck 49 ft wide.
Who owns FM 157 NB over Trinity River Relief?
It is owned by the State Highway Agency.