US Bridges

SH 183 Wbfr over Future IH20WB to SH121NB

Good

Tarrant County, Texas · 0.15 Mi. E. of SH 121 · Structure no. 022200050402482

Built
2013
12 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
84 ft
1 main span
Daily traffic
8,570
2024 count
Owner
State
State Highway Agency

About this bridge

SH 183 Wbfr over Future IH20WB to SH121NB is a prestressed concrete stringer/multi-beam or girder carrying SH 183 Wbfr over Future IH20WB to SH121NB in Tarrant County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,570 vehicles a day, roughly 5% of them trucks, projected to reach 4,400 by 2033. The structure is 84 ft (25.7 m) long and 43 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSH 183 Wbfr
CrossesFuture IH20WB to SH121NB
Location0.15 Mi. E. of SH 121
RouteState Highway 183
StateTexas
Coordinates32.68569, -97.40298
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length84 ft (25.7 m)
Longest span84 ft (25.7 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,570 (2024)
Projected traffic4,400 by 2033
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH 183 Wbfr over Future IH20WB to SH121NB built?

It was built in 2013, making it 12 years old in 2025.

What condition is SH 183 Wbfr over Future IH20WB to SH121NB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does SH 183 Wbfr over Future IH20WB to SH121NB carry?

About 8,570 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is SH 183 Wbfr over Future IH20WB to SH121NB?

The structure is 84 ft (25.7 m) long with a longest span of 84 ft (25.7 m) and a deck 43 ft wide.

Who owns SH 183 Wbfr over Future IH20WB to SH121NB?

It is owned by the State Highway Agency.