SH-121/183 Split over SH-183 Main Lanes & Gpl
GoodTarrant County, Texas · 1.3 MI W of FM 157 · Structure no. 022200036401648
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected April 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 889 ft
- 11 main spans
- Daily traffic
- 28,600
- 2010 count
- Owner
- State
- State Highway Agency
About this bridge
SH-121/183 Split over SH-183 Main Lanes & Gpl is a prestressed concrete stringer/multi-beam or girder carrying SH-121/183 Split over SH-183 Main Lanes & Gpl in Tarrant County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 28,600 vehicles a day, roughly 5% of them trucks, projected to reach 40,000 by 2030. The structure is 889 ft (271 m) long and 40 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH-121/183 Split over SH-183 Main Lanes & Gpl built?
It was built in 2013, making it 12 years old in 2025.
What condition is SH-121/183 Split over SH-183 Main Lanes & Gpl in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2022.
How much traffic does SH-121/183 Split over SH-183 Main Lanes & Gpl carry?
About 28,600 vehicles per day (2010 count), of which roughly 5% are trucks.
How long is SH-121/183 Split over SH-183 Main Lanes & Gpl?
The structure is 889 ft (271 m) long with a longest span of 102 ft (31.1 m) and a deck 40 ft wide.
Who owns SH-121/183 Split over SH-183 Main Lanes & Gpl?
It is owned by the State Highway Agency and maintained by the Local Toll Authority.