US Bridges

SH121NB to SH114EB over SH 114 NB Off Ramp

Good

Tarrant County, Texas · 0.2 Mi. E. of Will. Tate · Structure no. 022200035303468

Built
2013
12 years old
Condition
Good
inspected May 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
146 ft
1 main span
Daily traffic
3,300
2013 count
Owner
State
State Highway Agency

About this bridge

SH121NB to SH114EB over SH 114 NB Off Ramp is a prestressed concrete stringer/multi-beam or girder carrying SH121NB to SH114EB over SH 114 NB Off Ramp in Tarrant County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,300 vehicles a day, roughly 5% of them trucks, projected to reach 5,300 by 2033. The structure is 146 ft (44.5 m) long and 28 ft wide.

CarriesSH121NB to SH114EB
CrossesSH 114 NB Off Ramp
Location0.2 Mi. E. of Will. Tate
RouteState Highway 114
StateTexas
Coordinates32.92203, -97.08578
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMay 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length146 ft (44.5 m)
Longest span146 ft (44.5 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deck39 ft (12 m)

Traffic and service

Average daily traffic3,300 (2013)
Projected traffic5,300 by 2033
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH121NB to SH114EB over SH 114 NB Off Ramp built?

It was built in 2013, making it 12 years old in 2025.

What condition is SH121NB to SH114EB over SH 114 NB Off Ramp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2022.

How much traffic does SH121NB to SH114EB over SH 114 NB Off Ramp carry?

About 3,300 vehicles per day (2013 count), of which roughly 5% are trucks.

How long is SH121NB to SH114EB over SH 114 NB Off Ramp?

The structure is 146 ft (44.5 m) long with a longest span of 146 ft (44.5 m) and a deck 28 ft wide.

Who owns SH121NB to SH114EB over SH 114 NB Off Ramp?

It is owned by the State Highway Agency.