US Bridges

SH 114 over Dove Creek

Good

Tarrant County, Texas · .550 MI W of Carroll Ave · Structure no. 022200035303198

Built
2004
21 years old
Condition
Good
inspected April 2024
Type
Culvert
Concrete
Length
37 ft
5 main spans
Daily traffic
3,753
2024 count
Owner
State
State Highway Agency

About this bridge

SH 114 over Dove Creek is a concrete culvert carrying SH 114 over Dove Creek in Tarrant County, Texas. It was built in 2004, so it is 21 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,753 vehicles a day, roughly 10% of them trucks, projected to reach 192,972 by 2040. The structure is 37 ft (11.3 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSH 114
CrossesDove Creek
Location.550 MI W of Carroll Ave
RouteState Highway 114
StateTexas
Coordinates32.95709, -97.14156
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans5
Design loadHS 20
Structure length37 ft (11.3 m)
Longest span7 ft (2.1 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,753 (2024)
Projected traffic192,972 by 2040
Trucks10%
Lanes on structure14
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 114 over Dove Creek built?

It was built in 2004, making it 21 years old in 2025.

What condition is SH 114 over Dove Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does SH 114 over Dove Creek carry?

About 3,753 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is SH 114 over Dove Creek?

The structure is 37 ft (11.3 m) long with a longest span of 7 ft (2.1 m).

Who owns SH 114 over Dove Creek?

It is owned by the State Highway Agency.