US Bridges

US 287 NB Frtg RD over Walnut Creek

Good

Tarrant County, Texas · 2.0 MI S of FM 157 · Structure no. 022200017209448

Built
2012
13 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
350 ft
4 main spans
Daily traffic
6,200
2009 count
Owner
State
State Highway Agency

About this bridge

US 287 NB Frtg RD over Walnut Creek is a prestressed concrete stringer/multi-beam or girder carrying US 287 NB Frtg RD over Walnut Creek in Tarrant County, Texas. It was built in 2012, so it is 13 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,200 vehicles a day, roughly 20% of them trucks, projected to reach 9,800 by 2029. The structure is 350 ft (106.7 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 287 NB Frtg RD
CrossesWalnut Creek
Location2.0 MI S of FM 157
RouteU.S. Route 287
StateTexas
Coordinates32.57504, -97.12288
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans4
Design loadHL 93
Structure length350 ft (106.7 m)
Longest span88 ft (26.8 m)
Deck width38 ft (11.6 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,200 (2009)
Projected traffic9,800 by 2029
Trucks20%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 287 NB Frtg RD over Walnut Creek built?

It was built in 2012, making it 13 years old in 2025.

What condition is US 287 NB Frtg RD over Walnut Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does US 287 NB Frtg RD over Walnut Creek carry?

About 6,200 vehicles per day (2009 count), of which roughly 20% are trucks.

How long is US 287 NB Frtg RD over Walnut Creek?

The structure is 350 ft (106.7 m) long with a longest span of 88 ft (26.8 m) and a deck 38 ft wide.

Who owns US 287 NB Frtg RD over Walnut Creek?

It is owned by the State Highway Agency.