US Bridges

US 287 NB over Debbie Lane

Good

Tarrant County, Texas · 0.4 MI S of FM 157 · Structure no. 022200017209157

Built
1982
43 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
150 ft
1 main span
Daily traffic
35,907
2023 count
Owner
State
State Highway Agency

About this bridge

US 287 NB over Debbie Lane is a prestressed concrete stringer/multi-beam or girder carrying US 287 NB over Debbie Lane in Tarrant County, Texas. It was built in 1982, so it is 43 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 35,907 vehicles a day, roughly 10% of them trucks, projected to reach 33,060 by 2033. The structure is 150 ft (45.7 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 287 NB
CrossesDebbie Lane
Location0.4 MI S of FM 157
RouteU.S. Route 287
StateTexas
Coordinates32.59314, -97.1436
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 20
Structure length150 ft (45.7 m)
Longest span70 ft (21.3 m)
Deck width40 ft (12.1 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic35,907 (2023)
Projected traffic33,060 by 2033
Trucks10%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 287 NB over Debbie Lane built?

It was built in 1982, making it 43 years old in 2025.

What condition is US 287 NB over Debbie Lane in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does US 287 NB over Debbie Lane carry?

About 35,907 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is US 287 NB over Debbie Lane?

The structure is 150 ft (45.7 m) long with a longest span of 70 ft (21.3 m) and a deck 40 ft wide.

Who owns US 287 NB over Debbie Lane?

It is owned by the State Highway Agency.