US Bridges

SH 199 WB over Hanger Cutoff Road

Good

Tarrant County, Texas · 2.8 Mi. W. of FM 1886 · Structure no. 022200017104244

Built
2019
6 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
185 ft
1 main span
Daily traffic
30,804
2018 count
Owner
State
State Highway Agency

About this bridge

SH 199 WB over Hanger Cutoff Road is a prestressed concrete stringer/multi-beam or girder carrying SH 199 WB over Hanger Cutoff Road in Tarrant County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30,804 vehicles a day, roughly 3% of them trucks, projected to reach 46,500 by 2038. The structure is 185 ft (56.4 m) long and 60 ft wide.

CarriesSH 199 WB
CrossesHanger Cutoff Road
Location2.8 Mi. W. of FM 1886
RouteState Highway 199
StateTexas
Coordinates32.85515, -97.51134
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHL 93
Structure length185 ft (56.4 m)
Longest span85 ft (25.9 m)
Deck width60 ft (18.3 m)
Roadway width57 ft (17.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30,804 (2018)
Projected traffic46,500 by 2038
Trucks3%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH 199 WB over Hanger Cutoff Road built?

It was built in 2019, making it 6 years old in 2025.

What condition is SH 199 WB over Hanger Cutoff Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does SH 199 WB over Hanger Cutoff Road carry?

About 30,804 vehicles per day (2018 count), of which roughly 3% are trucks.

How long is SH 199 WB over Hanger Cutoff Road?

The structure is 185 ft (56.4 m) long with a longest span of 85 ft (25.9 m) and a deck 60 ft wide.

Who owns SH 199 WB over Hanger Cutoff Road?

It is owned by the State Highway Agency.