US Bridges

SH 199 over Trib West Fork Trinity

Fair

Tarrant County, Texas · 0.7 MI NW of FM 1886 · Structure no. 022200017104048

Built
2011
14 years old
Condition
Fair
inspected August 2023
Type
Culvert
Concrete
Length
75 ft
6 main spans
Daily traffic
35,979
2022 count
Owner
State
State Highway Agency

About this bridge

SH 199 over Trib West Fork Trinity is a concrete culvert carrying SH 199 over Trib West Fork Trinity in Tarrant County, Texas. It was built in 2011, so it is 14 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 35,979 vehicles a day, roughly 6% of them trucks, projected to reach 50,371 by 2042. The structure is 75 ft (22.9 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSH 199
CrossesTrib West Fork Trinity
Location0.7 MI NW of FM 1886
RouteState Highway 199
StateTexas
Coordinates32.83446, -97.48872
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans6
Design loadHS 20
Structure length75 ft (22.9 m)
Longest span9 ft (2.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic35,979 (2022)
Projected traffic50,371 by 2042
Trucks6%
Lanes on structure12
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 199 over Trib West Fork Trinity built?

It was built in 2011, making it 14 years old in 2025.

What condition is SH 199 over Trib West Fork Trinity in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does SH 199 over Trib West Fork Trinity carry?

About 35,979 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is SH 199 over Trib West Fork Trinity?

The structure is 75 ft (22.9 m) long with a longest span of 9 ft (2.7 m).

Who owns SH 199 over Trib West Fork Trinity?

It is owned by the State Highway Agency.