US Bridges

IH-35W Managed Lns over Meacham Blvd.

Good

Tarrant County, Texas · 1.0 Mi. S. of IH-820 · Structure no. 022200001416604

Built
2016
9 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
206 ft
2 main spans
Daily traffic
143,855
2023 count
Owner
Toll Authority
Local Toll Authority

About this bridge

IH-35W Managed Lns over Meacham Blvd. is a prestressed concrete stringer/multi-beam or girder carrying IH-35W Managed Lns over Meacham Blvd. in Tarrant County, Texas. It was built in 2016, so it is 9 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 143,855 vehicles a day, roughly 13% of them trucks, projected to reach 201,397 by 2042. The structure is 206 ft (62.8 m) long and 80 ft wide.

CarriesIH-35W Managed Lns
CrossesMeacham Blvd.
Location1.0 Mi. S. of IH-820
StateTexas
Coordinates32.82438, -97.31288
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2 (+2 approach)
Design loadHL 93
Structure length206 ft (62.8 m)
Longest span63 ft (19.2 m)
Deck width80 ft (24.4 m)
Roadway width76 ft (23.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic143,855 (2023)
Projected traffic201,397 by 2042
Trucks13%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH-35W Managed Lns over Meacham Blvd. built?

It was built in 2016, making it 9 years old in 2025.

What condition is IH-35W Managed Lns over Meacham Blvd. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does IH-35W Managed Lns over Meacham Blvd. carry?

About 143,855 vehicles per day (2023 count), of which roughly 13% are trucks.

How long is IH-35W Managed Lns over Meacham Blvd.?

The structure is 206 ft (62.8 m) long with a longest span of 63 ft (19.2 m) and a deck 80 ft wide.

Who owns IH-35W Managed Lns over Meacham Blvd.?

It is owned by the Local Toll Authority.