IH-35W NB Managed over E. 4th Street
GoodTarrant County, Texas · 0.3 Mi. S. of SH 121 · Structure no. 022200001416603
- Built
- 2016
- 9 years old
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 291 ft
- 2 main spans
- Daily traffic
- 2,000
- 2015 count
- Owner
- Toll Authority
- Local Toll Authority
About this bridge
IH-35W NB Managed over E. 4th Street is a prestressed concrete stringer/multi-beam or girder carrying IH-35W NB Managed over E. 4th Street in Tarrant County, Texas. It was built in 2016, so it is 9 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,000 vehicles a day, roughly 11% of them trucks, projected to reach 4,500 by 2035. The structure is 291 ft (88.7 m) long and 28 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH-35W NB Managed over E. 4th Street built?
It was built in 2016, making it 9 years old in 2025.
What condition is IH-35W NB Managed over E. 4th Street in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does IH-35W NB Managed over E. 4th Street carry?
About 2,000 vehicles per day (2015 count), of which roughly 11% are trucks.
How long is IH-35W NB Managed over E. 4th Street?
The structure is 291 ft (88.7 m) long with a longest span of 116 ft (35.4 m) and a deck 28 ft wide.
Who owns IH-35W NB Managed over E. 4th Street?
It is owned by the Local Toll Authority.