US Bridges

IH-820 WB Gp Lanes over Holiday Lane

Good

Tarrant County, Texas · IH-820 WB @ Holiday LN · Structure no. 022200000814489

Built
2013
12 years old
Condition
Good
inspected May 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
206 ft
1 main span
Daily traffic
60,520
2019 count
Owner
State
State Highway Agency

About this bridge

IH-820 WB Gp Lanes over Holiday Lane is a prestressed concrete stringer/multi-beam or girder carrying IH-820 WB Gp Lanes over Holiday Lane in Tarrant County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 60,520 vehicles a day, roughly 6% of them trucks, projected to reach 108,700 by 2033. The structure is 206 ft (62.8 m) long and 58 ft wide.

CarriesIH-820 WB Gp Lanes
CrossesHoliday Lane
LocationIH-820 WB @ Holiday LN
RouteInterstate 820
StateTexas
Coordinates32.83884, -97.22789
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMay 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1 (+2 approach)
Design loadHL 93
Structure length206 ft (62.8 m)
Longest span95 ft (29 m)
Deck width58 ft (17.7 m)
Roadway width56 ft (17.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60,520 (2019)
Projected traffic108,700 by 2033
Trucks6%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH-820 WB Gp Lanes over Holiday Lane built?

It was built in 2013, making it 12 years old in 2025.

What condition is IH-820 WB Gp Lanes over Holiday Lane in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2022.

How much traffic does IH-820 WB Gp Lanes over Holiday Lane carry?

About 60,520 vehicles per day (2019 count), of which roughly 6% are trucks.

How long is IH-820 WB Gp Lanes over Holiday Lane?

The structure is 206 ft (62.8 m) long with a longest span of 95 ft (29 m) and a deck 58 ft wide.

Who owns IH-820 WB Gp Lanes over Holiday Lane?

It is owned by the State Highway Agency and maintained by the Local Toll Authority.