CR 153 over W Fork Gonzales Creek
FairPosted for loadStephens County, Texas · 1.00 MI W of FM 1852 · Structure no. 232150AA0153001
- Built
- 1970
- 55 years old
- Condition
- Fair
- inspected March 2023
- Type
- Girder and Floorbeam System
- Steel
- Length
- 50 ft
- 1 main span
- Daily traffic
- 50
- 2013 count
- Owner
- County
- County Highway Agency
About this bridge
CR 153 over W Fork Gonzales Creek is a steel girder and floorbeam system carrying CR 153 over W Fork Gonzales Creek in Stephens County, Texas. It was built in 1970, so it is 55 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 50 vehicles a day, roughly 2% of them trucks, projected to reach 50 by 2035. The structure is 50 ft (15.2 m) long and 14 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 153 over W Fork Gonzales Creek built?
It was built in 1970, making it 55 years old in 2025.
What condition is CR 153 over W Fork Gonzales Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does CR 153 over W Fork Gonzales Creek carry?
About 50 vehicles per day (2013 count), of which roughly 2% are trucks.
How long is CR 153 over W Fork Gonzales Creek?
The structure is 50 ft (15.2 m) long with a longest span of 50 ft (15.2 m) and a deck 14 ft wide.
Who owns CR 153 over W Fork Gonzales Creek?
It is owned by the County Highway Agency.