US Bridges

Pr 33 over Draw

Good

Stephens County, Texas · 0.34 N of US 180 · Structure no. 232150071402022

Built
2022
3 years old
Condition
Good
inspected September 2023
Type
Culvert
Concrete
Length
37 ft
4 main spans
Daily traffic
54
2022 count
Owner
State
State Highway Agency

About this bridge

Pr 33 over Draw is a concrete culvert carrying Pr 33 over Draw in Stephens County, Texas. It was built in 2022, so it is 3 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 54 vehicles a day, roughly 30% of them trucks, projected to reach 1 by 2042. The structure is 37 ft (11.3 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPr 33
CrossesDraw
Location0.34 N of US 180
RouteState Highway 33
StateTexas
Coordinates32.71774, -98.66857
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHL 93
Structure length37 ft (11.3 m)
Longest span8 ft (2.4 m)
Deck width34 ft (10.4 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic54 (2022)
Projected traffic1 by 2042
Trucks30%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Pr 33 over Draw built?

It was built in 2022, making it 3 years old in 2025.

What condition is Pr 33 over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Pr 33 over Draw carry?

About 54 vehicles per day (2022 count), of which roughly 30% are trucks.

How long is Pr 33 over Draw?

The structure is 37 ft (11.3 m) long with a longest span of 8 ft (2.4 m) and a deck 34 ft wide.

Who owns Pr 33 over Draw?

It is owned by the State Highway Agency.