US Bridges

FM 2686 over Remadura De Sandia Creek

Good

Starr County, Texas · 2.80 MI E of FM 649 · Structure no. 212140269303003

Built
1971
54 years old
Condition
Good
inspected April 2023
Type
Culvert
Concrete
Length
42 ft
5 main spans
Daily traffic
310
2023 count
Owner
State
State Highway Agency

About this bridge

FM 2686 over Remadura De Sandia Creek is a concrete culvert carrying FM 2686 over Remadura De Sandia Creek in Starr County, Texas. It was built in 1971, so it is 54 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 310 vehicles a day, roughly 25% of them trucks, projected to reach 310 by 2033. The structure is 42 ft (12.8 m) long and 38 ft wide. If it were closed, the detour would be 36 mi (58 km).

CarriesFM 2686
CrossesRemadura De Sandia Creek
Location2.80 MI E of FM 649
RouteState Highway 2686
StateTexas
Coordinates26.68678, -98.80749
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length42 ft (12.8 m)
Longest span8 ft (2.4 m)
Deck width38 ft (11.7 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic310 (2023)
Projected traffic310 by 2033
Trucks25%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed36 mi (58 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 2686 over Remadura De Sandia Creek built?

It was built in 1971, making it 54 years old in 2025.

What condition is FM 2686 over Remadura De Sandia Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does FM 2686 over Remadura De Sandia Creek carry?

About 310 vehicles per day (2023 count), of which roughly 25% are trucks.

How long is FM 2686 over Remadura De Sandia Creek?

The structure is 42 ft (12.8 m) long with a longest span of 8 ft (2.4 m) and a deck 38 ft wide.

Who owns FM 2686 over Remadura De Sandia Creek?

It is owned by the State Highway Agency.