Toll 49 over Stevenson Branch Relief
GoodSmith County, Texas · 1.6MI SW of US 69 · Structure no. 102120TL0049068
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 345 ft
- 3 main spans
- Daily traffic
- 2,532
- 2022 count
- Owner
- Toll Authority
- Local Toll Authority
About this bridge
Toll 49 over Stevenson Branch Relief is a prestressed concrete stringer/multi-beam or girder carrying Toll 49 over Stevenson Branch Relief in Smith County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,532 vehicles a day, roughly 7% of them trucks, projected to reach 3,545 by 2042. The structure is 345 ft (105.2 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Toll 49 over Stevenson Branch Relief built?
It was built in 2018, making it 7 years old in 2025.
What condition is Toll 49 over Stevenson Branch Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does Toll 49 over Stevenson Branch Relief carry?
About 2,532 vehicles per day (2022 count), of which roughly 7% are trucks.
How long is Toll 49 over Stevenson Branch Relief?
The structure is 345 ft (105.2 m) long with a longest span of 115 ft (35.1 m) and a deck 42 ft wide.
Who owns Toll 49 over Stevenson Branch Relief?
It is owned by the Local Toll Authority.