SH 64 over Prairie Creek
FairSmith County, Texas · 1.2 MI W of FM 2661 · Structure no. 102120024505034
- Built
- 1953
- 72 years old, rebuilt 1970
- Condition
- Fair
- inspected March 2023
- Type
- Slab
- Concrete Continuous
- Length
- 350 ft
- 14 main spans
- Daily traffic
- 7,512
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SH 64 over Prairie Creek is a concrete continuous slab carrying SH 64 over Prairie Creek in Smith County, Texas. It was built in 1953 and reconstructed in 1970, so it is 72 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,512 vehicles a day, roughly 13% of them trucks, projected to reach 7,827 by 2041. The structure is 350 ft (106.7 m) long and 50 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 64 over Prairie Creek built?
It was built in 1953, making it 72 years old in 2025. It was reconstructed in 1970.
What condition is SH 64 over Prairie Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does SH 64 over Prairie Creek carry?
About 7,512 vehicles per day (2023 count), of which roughly 13% are trucks.
How long is SH 64 over Prairie Creek?
The structure is 350 ft (106.7 m) long with a longest span of 25 ft (7.6 m) and a deck 50 ft wide.
Who owns SH 64 over Prairie Creek?
It is owned by the State Highway Agency.