US Bridges

Rough Rider DR over Trib of Huana Creek

Fair

Shelby County, Texas · 0.1 MI W of US 96 · Structure no. 112100T02491016

Built
2001
24 years old
Condition
Fair
inspected June 2023
Type
Culvert
Concrete
Length
62 ft
4 main spans
Daily traffic
3,207
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Rough Rider DR over Trib of Huana Creek is a concrete culvert carrying Rough Rider DR over Trib of Huana Creek in Shelby County, Texas. It was built in 2001, so it is 24 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,207 vehicles a day, roughly 3% of them trucks, projected to reach 4,490 by 2040. The structure is 62 ft (18.9 m) long and 131 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesRough Rider DR
CrossesTrib of Huana Creek
Location0.1 MI W of US 96
RouteState Highway 3534
StateTexas
Coordinates31.79976, -94.19172
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length62 ft (18.9 m)
Longest span10 ft (3 m)
Deck width131 ft (39.9 m)
Roadway width62 ft (18.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,207 (2020)
Projected traffic4,490 by 2040
Trucks3%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rough Rider DR over Trib of Huana Creek built?

It was built in 2001, making it 24 years old in 2025.

What condition is Rough Rider DR over Trib of Huana Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does Rough Rider DR over Trib of Huana Creek carry?

About 3,207 vehicles per day (2020 count), of which roughly 3% are trucks.

How long is Rough Rider DR over Trib of Huana Creek?

The structure is 62 ft (18.9 m) long with a longest span of 10 ft (3 m) and a deck 131 ft wide.

Who owns Rough Rider DR over Trib of Huana Creek?

It is owned by the City or Municipal Highway Agency.