US Bridges

FM 2261 over Woodfin Creek

Good

Shelby County, Texas · 0.6 Mi. E. of Jct. SH 87 · Structure no. 112100140903007

Built
2023
2 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
150 ft
3 main spans
Daily traffic
400
2021 count
Owner
State
State Highway Agency

About this bridge

FM 2261 over Woodfin Creek is a prestressed concrete stringer/multi-beam or girder carrying FM 2261 over Woodfin Creek in Shelby County, Texas. It was built in 2023, so it is 2 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 400 vehicles a day, projected to reach 500 by 2041. The structure is 150 ft (45.7 m) long and 34 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesFM 2261
CrossesWoodfin Creek
Location0.6 Mi. E. of Jct. SH 87
RouteState Highway 2261
StateTexas
Coordinates31.62095, -93.97262
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating62.9 US tons
Inventory rating39 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHL 93
Structure length150 ft (45.7 m)
Longest span50 ft (15.2 m)
Deck width34 ft (10.4 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic400 (2021)
Projected traffic500 by 2041
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 2261 over Woodfin Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is FM 2261 over Woodfin Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does FM 2261 over Woodfin Creek carry?

About 400 vehicles per day (2021 count).

How long is FM 2261 over Woodfin Creek?

The structure is 150 ft (45.7 m) long with a longest span of 50 ft (15.2 m) and a deck 34 ft wide.

Who owns FM 2261 over Woodfin Creek?

It is owned by the State Highway Agency.