US Bridges

US 283 over Salt Fork Hubbard Creek

Fair

Shackelford County, Texas · 2.15 MI S of US 180 · Structure no. 082090043701045

Built
1956
69 years old
Condition
Fair
inspected July 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
152 ft
5 main spans
Daily traffic
425
2020 count
Owner
State
State Highway Agency

About this bridge

US 283 over Salt Fork Hubbard Creek is a concrete stringer/multi-beam or girder carrying US 283 over Salt Fork Hubbard Creek in Shackelford County, Texas. It was built in 1956, so it is 69 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 425 vehicles a day, roughly 27% of them trucks, projected to reach 750 by 2033. The structure is 152 ft (46.3 m) long and 31 ft wide. If it were closed, the detour would be 21.7 mi (35 km).

CarriesUS 283
CrossesSalt Fork Hubbard Creek
Location2.15 MI S of US 180
RouteU.S. Route 283
StateTexas
Coordinates32.68716, -99.30027
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans5
Design loadH 20
Structure length152 ft (46.3 m)
Longest span30 ft (9.1 m)
Deck width31 ft (9.5 m)
Roadway width28 ft (8.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic425 (2020)
Projected traffic750 by 2033
Trucks27%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed21.7 mi (35 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 283 over Salt Fork Hubbard Creek built?

It was built in 1956, making it 69 years old in 2025.

What condition is US 283 over Salt Fork Hubbard Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does US 283 over Salt Fork Hubbard Creek carry?

About 425 vehicles per day (2020 count), of which roughly 27% are trucks.

How long is US 283 over Salt Fork Hubbard Creek?

The structure is 152 ft (46.3 m) long with a longest span of 30 ft (9.1 m) and a deck 31 ft wide.

Who owns US 283 over Salt Fork Hubbard Creek?

It is owned by the State Highway Agency.