CR 3755 (cr 81) over Drainage Ditch
PoorPosted for loadSan Patricio County, Texas · 1.00 MI S of SH 188 · Structure no. 162050AA0382001
- Built
- 1950
- 75 years old
- Condition
- Poor
- inspected June 2023
- Type
- Culvert
- Concrete
- Length
- 22 ft
- 2 main spans
- Daily traffic
- 24
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
CR 3755 (cr 81) over Drainage Ditch is a concrete culvert carrying CR 3755 (cr 81) over Drainage Ditch in San Patricio County, Texas. It was built in 1950, so it is 75 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 24 vehicles a day, projected to reach 34 by 2041. The structure is 22 ft (6.7 m) long and 22 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 3755 (cr 81) over Drainage Ditch built?
It was built in 1950, making it 75 years old in 2025.
What condition is CR 3755 (cr 81) over Drainage Ditch in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in June 2023.
How much traffic does CR 3755 (cr 81) over Drainage Ditch carry?
About 24 vehicles per day (2021 count).
How long is CR 3755 (cr 81) over Drainage Ditch?
The structure is 22 ft (6.7 m) long with a longest span of 10 ft (3 m) and a deck 22 ft wide.
Who owns CR 3755 (cr 81) over Drainage Ditch?
It is owned by the County Highway Agency.