CR 1490 (cr 80) over Drainage Ditch
FairPosted for loadSan Patricio County, Texas · 0.5 MI W of FM 1074 · Structure no. 162050AA0320002
- Built
- 1950
- 75 years old, rebuilt 1980
- Condition
- Fair
- inspected June 2023
- Type
- Culvert
- Concrete
- Length
- 33 ft
- 3 main spans
- Daily traffic
- 52
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
CR 1490 (cr 80) over Drainage Ditch is a concrete culvert carrying CR 1490 (cr 80) over Drainage Ditch in San Patricio County, Texas. It was built in 1950 and reconstructed in 1980, so it is 75 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 52 vehicles a day, roughly 3% of them trucks, projected to reach 52 by 2041. The structure is 33 ft (10.1 m) long and 19 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 1490 (cr 80) over Drainage Ditch built?
It was built in 1950, making it 75 years old in 2025. It was reconstructed in 1980.
What condition is CR 1490 (cr 80) over Drainage Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does CR 1490 (cr 80) over Drainage Ditch carry?
About 52 vehicles per day (2021 count), of which roughly 3% are trucks.
How long is CR 1490 (cr 80) over Drainage Ditch?
The structure is 33 ft (10.1 m) long with a longest span of 10 ft (3 m) and a deck 19 ft wide.
Who owns CR 1490 (cr 80) over Drainage Ditch?
It is owned by the County Highway Agency.