US Bridges

FM 796 over Chiltipin Creek

Fair

San Patricio County, Texas · 0.8 MI N of FM 630 · Structure no. 162050202601002

Built
1959
66 years old
Condition
Fair
inspected March 2024
Type
Slab
Concrete
Length
50 ft
2 main spans
Daily traffic
218
2022 count
Owner
State
State Highway Agency

About this bridge

FM 796 over Chiltipin Creek is a concrete slab carrying FM 796 over Chiltipin Creek in San Patricio County, Texas. It was built in 1959, so it is 66 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 218 vehicles a day, roughly 49% of them trucks, projected to reach 305 by 2042. The structure is 50 ft (15.2 m) long and 25 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesFM 796
CrossesChiltipin Creek
Location0.8 MI N of FM 630
RouteState Highway 796
StateTexas
Coordinates28.04095, -97.67238
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.9 US tons
Inventory rating28 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadOther
Structure length50 ft (15.2 m)
Longest span25 ft (7.6 m)
Deck width25 ft (7.7 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic218 (2022)
Projected traffic305 by 2042
Trucks49%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 796 over Chiltipin Creek built?

It was built in 1959, making it 66 years old in 2025.

What condition is FM 796 over Chiltipin Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does FM 796 over Chiltipin Creek carry?

About 218 vehicles per day (2022 count), of which roughly 49% are trucks.

How long is FM 796 over Chiltipin Creek?

The structure is 50 ft (15.2 m) long with a longest span of 25 ft (7.6 m) and a deck 25 ft wide.

Who owns FM 796 over Chiltipin Creek?

It is owned by the State Highway Agency.