US Bridges

FM 666 over Nueces River

Fair

San Patricio County, Texas · 11.3 MI S of SH 359 · Structure no. 162050105203021

Built
1951
74 years old, rebuilt 1988
Condition
Fair
inspected March 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
350 ft
3 main spans
Daily traffic
2,359
2024 count
Owner
State
State Highway Agency

About this bridge

FM 666 over Nueces River is a steel continuous stringer/multi-beam or girder carrying FM 666 over Nueces River in San Patricio County, Texas. It was built in 1951 and reconstructed in 1988, so it is 74 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,359 vehicles a day, roughly 11% of them trucks, projected to reach 3,390 by 2042. The structure is 350 ft (106.7 m) long and 46 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesFM 666
CrossesNueces River
Location11.3 MI S of SH 359
RouteState Highway 666
StateTexas
Coordinates27.93791, -97.77572
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.5 US tons
Inventory rating28.4 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3 (+3 approach)
Design loadOther
Structure length350 ft (106.7 m)
Longest span90 ft (27.4 m)
Deck width46 ft (14 m)
Roadway width44 ft (13.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,359 (2024)
Projected traffic3,390 by 2042
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 666 over Nueces River built?

It was built in 1951, making it 74 years old in 2025. It was reconstructed in 1988.

What condition is FM 666 over Nueces River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does FM 666 over Nueces River carry?

About 2,359 vehicles per day (2024 count), of which roughly 11% are trucks.

How long is FM 666 over Nueces River?

The structure is 350 ft (106.7 m) long with a longest span of 90 ft (27.4 m) and a deck 46 ft wide.

Who owns FM 666 over Nueces River?

It is owned by the State Highway Agency.