US Bridges

CR 254 over Niciper Creek

Good

San Augustine County, Texas · 1.10 MI N of SH 21 · Structure no. 112030AA0118001

Built
2011
14 years old
Condition
Good
inspected September 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
65 ft
1 main span
Daily traffic
4
2023 count
Owner
County
County Highway Agency

About this bridge

CR 254 over Niciper Creek is a prestressed concrete box beam or girders - multiple carrying CR 254 over Niciper Creek in San Augustine County, Texas. It was built in 2011, so it is 14 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4 vehicles a day, projected to reach 60 by 2030. The structure is 65 ft (19.8 m) long and 26 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesCR 254
CrossesNiciper Creek
Location1.10 MI N of SH 21
RouteCounty Highway 254
StateTexas
Coordinates31.52061, -94.28357
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length65 ft (19.8 m)
Longest span65 ft (19.8 m)
Deck width26 ft (8 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4 (2023)
Projected traffic60 by 2030
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$6,000
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 254 over Niciper Creek built?

It was built in 2011, making it 14 years old in 2025.

What condition is CR 254 over Niciper Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does CR 254 over Niciper Creek carry?

About 4 vehicles per day (2023 count).

How long is CR 254 over Niciper Creek?

The structure is 65 ft (19.8 m) long with a longest span of 65 ft (19.8 m) and a deck 26 ft wide.

Who owns CR 254 over Niciper Creek?

It is owned by the County Highway Agency.