US Bridges

FM 83 over Harvey Creek

Fair

San Augustine County, Texas · 1.80 MI E of FM 147 · Structure no. 112030263701002

Built
1963
62 years old
Condition
Fair
inspected May 2024
Type
Slab
Concrete
Length
100 ft
4 main spans
Daily traffic
1,591
2020 count
Owner
State
State Highway Agency

About this bridge

FM 83 over Harvey Creek is a concrete slab carrying FM 83 over Harvey Creek in San Augustine County, Texas. It was built in 1963, so it is 62 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,591 vehicles a day, roughly 7% of them trucks, projected to reach 2,227 by 2040. The structure is 100 ft (30.5 m) long and 25 ft wide. If it were closed, the detour would be 19.3 mi (31 km).

CarriesFM 83
CrossesHarvey Creek
Location1.80 MI E of FM 147
RouteState Highway 83
StateTexas
Coordinates31.29449, -94.24406
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating31 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadH 15
Structure length100 ft (30.5 m)
Longest span25 ft (7.6 m)
Deck width25 ft (7.7 m)
Roadway width23 ft (7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,591 (2020)
Projected traffic2,227 by 2040
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed19.3 mi (31 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 83 over Harvey Creek built?

It was built in 1963, making it 62 years old in 2025.

What condition is FM 83 over Harvey Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.

How much traffic does FM 83 over Harvey Creek carry?

About 1,591 vehicles per day (2020 count), of which roughly 7% are trucks.

How long is FM 83 over Harvey Creek?

The structure is 100 ft (30.5 m) long with a longest span of 25 ft (7.6 m) and a deck 25 ft wide.

Who owns FM 83 over Harvey Creek?

It is owned by the State Highway Agency.