San Augustine County, Texas · 3.40 MI S of SH 21 · Structure no. 112030168002004

Built
1956
69 years old, rebuilt 2005
Condition
Good
inspected May 2024
Type
Culvert
Concrete
Length
22 ft
2 main spans
Daily traffic
421
2020 count
Owner
State
State Highway Agency

About this bridge

FM 2213 over Draw is a concrete culvert carrying FM 2213 over Draw in San Augustine County, Texas. It was built in 1956 and reconstructed in 2005, so it is 69 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 421 vehicles a day, roughly 6% of them trucks, projected to reach 589 by 2040. The structure is 22 ft (6.7 m) long and 41 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesFM 2213
CrossesDraw
Location3.40 MI S of SH 21
RouteState Highway 2213
StateTexas
Coordinates31.48226, -94.11621
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44.6 US tons
Inventory rating26.6 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length22 ft (6.7 m)
Longest span10 ft (3 m)
Deck width41 ft (12.6 m)
Roadway width24 ft (7.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic421 (2020)
Projected traffic589 by 2040
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 2213 over Draw built?

It was built in 1956, making it 69 years old in 2025. It was reconstructed in 2005.

What condition is FM 2213 over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does FM 2213 over Draw carry?

About 421 vehicles per day (2020 count), of which roughly 6% are trucks.

How long is FM 2213 over Draw?

The structure is 22 ft (6.7 m) long with a longest span of 10 ft (3 m) and a deck 41 ft wide.

Who owns FM 2213 over Draw?

It is owned by the State Highway Agency.