US Bridges

192 over Wet Land

Good

Sabine County, Texas · 1.3 MI S of SH87 · Structure no. 081307000019006

Built
2006
19 years old
Condition
Good
inspected April 2024
Type
Frame
Prestressed Concrete
Length
42 ft
1 main span
Daily traffic
50
Owner
Federal
U.S. Forest Service

About this bridge

192 over Wet Land is a prestressed concrete frame carrying 192 over Wet Land in Sabine County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 42 ft (12.8 m) long and 22 ft wide. If it were closed, the detour would be 620.7 mi (999 km).

Carries192
CrossesWet Land
Location1.3 MI S of SH87
RouteFederal Lands Road 192
StateTexas
Coordinates31.44148, -93.76829
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating22 US tons

Structure

Structure typeFrame
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length42 ft (12.8 m)
Longest span40 ft (12.2 m)
Deck width22 ft (6.7 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (—)
Projected traffic75 by 2045
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed620.7 mi (999 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 192 over Wet Land built?

It was built in 2006, making it 19 years old in 2025.

What condition is 192 over Wet Land in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does 192 over Wet Land carry?

About 50 vehicles per day (latest count).

How long is 192 over Wet Land?

The structure is 42 ft (12.8 m) long with a longest span of 40 ft (12.2 m) and a deck 22 ft wide.

Who owns 192 over Wet Land?

It is owned by the U.S. Forest Service.