US Bridges

FM 225 over E Fk Angelina River Rel

Fair

Rusk County, Texas · 2.50 MI S of US 84 · Structure no. 102010059403027

Built
1990
35 years old
Condition
Fair
inspected May 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
425 ft
14 main spans
Daily traffic
476
2020 count
Owner
State
State Highway Agency

About this bridge

FM 225 over E Fk Angelina River Rel is a concrete stringer/multi-beam or girder carrying FM 225 over E Fk Angelina River Rel in Rusk County, Texas. It was built in 1990, so it is 35 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 476 vehicles a day, roughly 11% of them trucks, projected to reach 850 by 2039. The structure is 425 ft (129.5 m) long and 43 ft wide. If it were closed, the detour would be 14.3 mi (23 km).

CarriesFM 225
CrossesE Fk Angelina River Rel
Location2.50 MI S of US 84
RouteState Highway 225
StateTexas
Coordinates31.86042, -94.82305
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans14
Design loadHS 20
Structure length425 ft (129.5 m)
Longest span30 ft (9.1 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic476 (2020)
Projected traffic850 by 2039
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed14.3 mi (23 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 225 over E Fk Angelina River Rel built?

It was built in 1990, making it 35 years old in 2025.

What condition is FM 225 over E Fk Angelina River Rel in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does FM 225 over E Fk Angelina River Rel carry?

About 476 vehicles per day (2020 count), of which roughly 11% are trucks.

How long is FM 225 over E Fk Angelina River Rel?

The structure is 425 ft (129.5 m) long with a longest span of 30 ft (9.1 m) and a deck 43 ft wide.

Who owns FM 225 over E Fk Angelina River Rel?

It is owned by the State Highway Agency.