US Bridges

IH 30 EB over Erby Campbell Blvd

Good

Rockwall County, Texas · 0.60 MI SW of FM 548 · Structure no. 181990000912479

Built
2016
9 years old
Condition
Good
inspected February 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
350 ft
3 main spans
Daily traffic
27,070
2018 count
Owner
State
State Highway Agency

About this bridge

IH 30 EB over Erby Campbell Blvd is a prestressed concrete stringer/multi-beam or girder carrying IH 30 EB over Erby Campbell Blvd in Rockwall County, Texas. It was built in 2016, so it is 9 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 27,070 vehicles a day, roughly 24% of them trucks, projected to reach 36,125 by 2037. The structure is 350 ft (106.7 m) long and 69 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesIH 30 EB
CrossesErby Campbell Blvd
Location0.60 MI SW of FM 548
RouteInterstate 30
StateTexas
Coordinates32.96396, -96.34066
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length350 ft (106.7 m)
Longest span120 ft (36.6 m)
Deck width69 ft (21 m)
Roadway width68 ft (20.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic27,070 (2018)
Projected traffic36,125 by 2037
Trucks24%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 30 EB over Erby Campbell Blvd built?

It was built in 2016, making it 9 years old in 2025.

What condition is IH 30 EB over Erby Campbell Blvd in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does IH 30 EB over Erby Campbell Blvd carry?

About 27,070 vehicles per day (2018 count), of which roughly 24% are trucks.

How long is IH 30 EB over Erby Campbell Blvd?

The structure is 350 ft (106.7 m) long with a longest span of 120 ft (36.6 m) and a deck 69 ft wide.

Who owns IH 30 EB over Erby Campbell Blvd?

It is owned by the State Highway Agency.