US Bridges

FM 2954 over Hurricane Creek

Good

Robertson County, Texas · 7.8 MI E of FM 46 · Structure no. 171980330101004

Built
1984
41 years old
Condition
Good
inspected November 2024
Type
Culvert
Concrete
Length
42 ft
5 main spans
Daily traffic
187
2023 count
Owner
State
State Highway Agency

About this bridge

FM 2954 over Hurricane Creek is a concrete culvert carrying FM 2954 over Hurricane Creek in Robertson County, Texas. It was built in 1984, so it is 41 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 187 vehicles a day, roughly 21% of them trucks, projected to reach 220 by 2033. The structure is 42 ft (12.8 m) long and 45 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesFM 2954
CrossesHurricane Creek
Location7.8 MI E of FM 46
RouteState Highway 2954
StateTexas
Coordinates31.20813, -96.56469
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length42 ft (12.8 m)
Longest span8 ft (2.4 m)
Deck width45 ft (13.8 m)
Roadway width28 ft (8.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic187 (2023)
Projected traffic220 by 2033
Trucks21%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 2954 over Hurricane Creek built?

It was built in 1984, making it 41 years old in 2025.

What condition is FM 2954 over Hurricane Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does FM 2954 over Hurricane Creek carry?

About 187 vehicles per day (2023 count), of which roughly 21% are trucks.

How long is FM 2954 over Hurricane Creek?

The structure is 42 ft (12.8 m) long with a longest span of 8 ft (2.4 m) and a deck 45 ft wide.

Who owns FM 2954 over Hurricane Creek?

It is owned by the State Highway Agency.