SH 6 SB over Walnut Creek Relief No 1
GoodRobertson County, Texas · 0.4 MI S of FM 2159 · Structure no. 171980004906154
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 300 ft
- 6 main spans
- Daily traffic
- 5,051
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SH 6 SB over Walnut Creek Relief No 1 is a prestressed concrete stringer/multi-beam or girder carrying SH 6 SB over Walnut Creek Relief No 1 in Robertson County, Texas. It was built in 2008, so it is 17 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,051 vehicles a day, roughly 38% of them trucks, projected to reach 8,688 by 2042. The structure is 300 ft (91.4 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 6 SB over Walnut Creek Relief No 1 built?
It was built in 2008, making it 17 years old in 2025.
What condition is SH 6 SB over Walnut Creek Relief No 1 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does SH 6 SB over Walnut Creek Relief No 1 carry?
About 5,051 vehicles per day (2023 count), of which roughly 38% are trucks.
How long is SH 6 SB over Walnut Creek Relief No 1?
The structure is 300 ft (91.4 m) long with a longest span of 50 ft (15.2 m) and a deck 40 ft wide.
Who owns SH 6 SB over Walnut Creek Relief No 1?
It is owned by the State Highway Agency.