FM 2678 over Mission River N Relief
FairRefugio County, Texas · 7.80 MI S of FM 774 · Structure no. 161960015506033
- Built
- 1965
- 60 years old, rebuilt 1988
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 819 ft
- 27 main spans
- Daily traffic
- 3,394
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
FM 2678 over Mission River N Relief is a concrete stringer/multi-beam or girder carrying FM 2678 over Mission River N Relief in Refugio County, Texas. It was built in 1965 and reconstructed in 1988, so it is 60 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,394 vehicles a day, roughly 11% of them trucks, projected to reach 4,616 by 2042. The structure is 819 ft (249.6 m) long and 46 ft wide. If it were closed, the detour would be 16.8 mi (27 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 2678 over Mission River N Relief built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1988.
What condition is FM 2678 over Mission River N Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does FM 2678 over Mission River N Relief carry?
About 3,394 vehicles per day (2022 count), of which roughly 11% are trucks.
How long is FM 2678 over Mission River N Relief?
The structure is 819 ft (249.6 m) long with a longest span of 30 ft (9.1 m) and a deck 46 ft wide.
Who owns FM 2678 over Mission River N Relief?
It is owned by the State Highway Agency.