US Bridges

FM 3078 over Prysor Draw

Good

Reeves County, Texas · 2.90 MI SE of IH 10 · Structure no. 061950044101195

Built
2024
1 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
155 ft
3 main spans
Daily traffic
22
2023 count
Owner
State
State Highway Agency

About this bridge

FM 3078 over Prysor Draw is a prestressed concrete stringer/multi-beam or girder carrying FM 3078 over Prysor Draw in Reeves County, Texas. It was built in 2024, so it is 1 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 22 vehicles a day, roughly 9% of them trucks, projected to reach 1 by 1900. The structure is 155 ft (47.2 m) long and 37 ft wide. If it were closed, the detour would be 13 mi (21 km).

CarriesFM 3078
CrossesPrysor Draw
Location2.90 MI SE of IH 10
RouteState Highway 3078
StateTexas
Coordinates31.01554, -103.94645
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length155 ft (47.2 m)
Longest span55 ft (16.8 m)
Deck width37 ft (11.4 m)
Roadway width35 ft (10.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22 (2023)
Projected traffic1 by 1900
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed13 mi (21 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 3078 over Prysor Draw built?

It was built in 2024, making it 1 years old in 2025.

What condition is FM 3078 over Prysor Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does FM 3078 over Prysor Draw carry?

About 22 vehicles per day (2023 count), of which roughly 9% are trucks.

How long is FM 3078 over Prysor Draw?

The structure is 155 ft (47.2 m) long with a longest span of 55 ft (16.8 m) and a deck 37 ft wide.

Who owns FM 3078 over Prysor Draw?

It is owned by the State Highway Agency.