US 83 over Flat Creek North Relief
FairReal County, Texas · 2.5 MI S of RR 337 · Structure no. 071930003606004
- Built
- 1932
- 93 years old, rebuilt 1957
- Condition
- Fair
- inspected July 2024
- Type
- Culvert
- Concrete
- Length
- 61 ft
- 7 main spans
- Daily traffic
- 2,745
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
US 83 over Flat Creek North Relief is a concrete culvert carrying US 83 over Flat Creek North Relief in Real County, Texas. It was built in 1932 and reconstructed in 1957, so it is 93 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,745 vehicles a day, roughly 13% of them trucks, projected to reach 3,318 by 2038. The structure is 61 ft (18.7 m) long and 45 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 83 over Flat Creek North Relief built?
It was built in 1932, making it 93 years old in 2025. It was reconstructed in 1957.
What condition is US 83 over Flat Creek North Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does US 83 over Flat Creek North Relief carry?
About 2,745 vehicles per day (2020 count), of which roughly 13% are trucks.
How long is US 83 over Flat Creek North Relief?
The structure is 61 ft (18.7 m) long with a longest span of 8 ft (2.4 m) and a deck 45 ft wide.
Who owns US 83 over Flat Creek North Relief?
It is owned by the State Highway Agency.