US Bridges

Slp 335 WB over Bell ST

Good

Randall County, Texas · .44 MI E. of IH 27 · Structure no. 041910263502083

Built
2019
6 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
265 ft
2 main spans
Daily traffic
6,036
2023 count
Owner
State
State Highway Agency

About this bridge

Slp 335 WB over Bell ST is a prestressed concrete stringer/multi-beam or girder carrying Slp 335 WB over Bell ST in Randall County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,036 vehicles a day, roughly 7% of them trucks, projected to reach 1 by 2033. The structure is 265 ft (80.8 m) long and 40 ft wide.

CarriesSlp 335 WB
CrossesBell ST
Location.44 MI E. of IH 27
RouteState Highway 335
StateTexas
Coordinates35.11678, -101.90176
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2 (+1 approach)
Design loadHL 93
Structure length265 ft (80.8 m)
Longest span105 ft (32 m)
Deck width40 ft (12.2 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,036 (2023)
Projected traffic1 by 2033
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Slp 335 WB over Bell ST built?

It was built in 2019, making it 6 years old in 2025.

What condition is Slp 335 WB over Bell ST in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Slp 335 WB over Bell ST carry?

About 6,036 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is Slp 335 WB over Bell ST?

The structure is 265 ft (80.8 m) long with a longest span of 105 ft (32 m) and a deck 40 ft wide.

Who owns Slp 335 WB over Bell ST?

It is owned by the State Highway Agency.