Lp 335 Sbfr over Playa 1 (helium)
GoodRandall County, Texas · 0.78 MI S of IH40 · Structure no. 041910263501094
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,210 ft
- 11 main spans
- Daily traffic
- 14,680
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
Lp 335 Sbfr over Playa 1 (helium) is a prestressed concrete stringer/multi-beam or girder carrying Lp 335 Sbfr over Playa 1 (helium) in Randall County, Texas. It was built in 2021, so it is 4 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 14,680 vehicles a day, roughly 15% of them trucks, projected to reach 20,000 by 2035. The structure is 1,210 ft (368.8 m) long and 37 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lp 335 Sbfr over Playa 1 (helium) built?
It was built in 2021, making it 4 years old in 2025.
What condition is Lp 335 Sbfr over Playa 1 (helium) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Lp 335 Sbfr over Playa 1 (helium) carry?
About 14,680 vehicles per day (2021 count), of which roughly 15% are trucks.
How long is Lp 335 Sbfr over Playa 1 (helium)?
The structure is 1,210 ft (368.8 m) long with a longest span of 110 ft (33.5 m) and a deck 37 ft wide.
Who owns Lp 335 Sbfr over Playa 1 (helium)?
It is owned by the State Highway Agency.