US Bridges

FM 2219 over Arroyo

Good

Randall County, Texas · 7.5 MI W of US 60 · Structure no. 041910200202002

Built
1964
61 years old, rebuilt 1971
Condition
Good
inspected October 2023
Type
Culvert
Concrete
Length
29 ft
5 main spans
Daily traffic
1,086
2022 count
Owner
State
State Highway Agency

About this bridge

FM 2219 over Arroyo is a concrete culvert carrying FM 2219 over Arroyo in Randall County, Texas. It was built in 1964 and reconstructed in 1971, so it is 61 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,086 vehicles a day, roughly 27% of them trucks, projected to reach 1,520 by 2042. The structure is 29 ft (8.8 m) long and 45 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesFM 2219
CrossesArroyo
Location7.5 MI W of US 60
RouteState Highway 2219
StateTexas
Coordinates35.05828, -102.04821
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length29 ft (8.8 m)
Longest span5 ft (1.5 m)
Deck width45 ft (13.8 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,086 (2022)
Projected traffic1,520 by 2042
Trucks27%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 2219 over Arroyo built?

It was built in 1964, making it 61 years old in 2025. It was reconstructed in 1971.

What condition is FM 2219 over Arroyo in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does FM 2219 over Arroyo carry?

About 1,086 vehicles per day (2022 count), of which roughly 27% are trucks.

How long is FM 2219 over Arroyo?

The structure is 29 ft (8.8 m) long with a longest span of 5 ft (1.5 m) and a deck 45 ft wide.

Who owns FM 2219 over Arroyo?

It is owned by the State Highway Agency.