FM 1541 over P.D.T. Fork of Red River
GoodRandall County, Texas · 3.4 MI N of SH 214 · Structure no. 041910148002071
- Built
- 2012
- 13 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 220 ft
- 1 main span
- Daily traffic
- 3,896
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
FM 1541 over P.D.T. Fork of Red River is a prestressed concrete stringer/multi-beam or girder carrying FM 1541 over P.D.T. Fork of Red River in Randall County, Texas. It was built in 2012, so it is 13 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,896 vehicles a day, roughly 1% of them trucks, projected to reach 5,400 by 2031. The structure is 220 ft (67.1 m) long and 46 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 1541 over P.D.T. Fork of Red River built?
It was built in 2012, making it 13 years old in 2025.
What condition is FM 1541 over P.D.T. Fork of Red River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does FM 1541 over P.D.T. Fork of Red River carry?
About 3,896 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is FM 1541 over P.D.T. Fork of Red River?
The structure is 220 ft (67.1 m) long with a longest span of 100 ft (30.5 m) and a deck 46 ft wide.
Who owns FM 1541 over P.D.T. Fork of Red River?
It is owned by the State Highway Agency.