US Bridges

CR 2420 over Draw

Good

Rains County, Texas · 1.3 Miles West of US 69 · Structure no. 011900AA2420001

Built
2024
1 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
41 ft
1 main span
Daily traffic
127
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

CR 2420 over Draw is a steel stringer/multi-beam or girder carrying CR 2420 over Draw in Rains County, Texas. It was built in 2024, so it is 1 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 127 vehicles a day, roughly 1% of them trucks, projected to reach 1 by 1900. The structure is 41 ft (12.5 m) long and 20 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCR 2420
CrossesDraw
Location1.3 Miles West of US 69
RouteCounty Highway 2420
StateTexas
Coordinates32.8079, -95.6823
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.9 US tons
Inventory rating38 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length41 ft (12.5 m)
Longest span41 ft (12.5 m)
Deck width20 ft (6.1 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic127 (2023)
Projected traffic1 by 1900
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was CR 2420 over Draw built?

It was built in 2024, making it 1 years old in 2025.

What condition is CR 2420 over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does CR 2420 over Draw carry?

About 127 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is CR 2420 over Draw?

The structure is 41 ft (12.5 m) long with a longest span of 41 ft (12.5 m) and a deck 20 ft wide.

Who owns CR 2420 over Draw?

It is owned by the City or Municipal Highway Agency and maintained by the County Highway Agency.