US Bridges

SW 9th Ave over Draw

Good

Potter County, Texas · 0.3 MI E of Lp 335 · Structure no. 041880801304008

Built
2006
19 years old
Condition
Good
inspected September 2024
Type
Culvert
Concrete
Length
26 ft
4 main spans
Daily traffic
2,950
2016 count
Owner
City
City or Municipal Highway Agency

About this bridge

SW 9th Ave over Draw is a concrete culvert carrying SW 9th Ave over Draw in Potter County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,950 vehicles a day, projected to reach 7,800 by 2036. The structure is 26 ft (7.9 m) long. If it were closed, the detour would be 3.7 mi (6 km).

CarriesSW 9th Ave
CrossesDraw
Location0.3 MI E of Lp 335
RouteCity Street 0
StateTexas
Coordinates35.20606, -101.93159
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHS 20
Structure length26 ft (7.9 m)
Longest span5 ft (1.5 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,950 (2016)
Projected traffic7,800 by 2036
Trucks0%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SW 9th Ave over Draw built?

It was built in 2006, making it 19 years old in 2025.

What condition is SW 9th Ave over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does SW 9th Ave over Draw carry?

About 2,950 vehicles per day (2016 count).

How long is SW 9th Ave over Draw?

The structure is 26 ft (7.9 m) long with a longest span of 5 ft (1.5 m).

Who owns SW 9th Ave over Draw?

It is owned by the City or Municipal Highway Agency.