US Bridges

Slp 335 Ebfr over Dry Creek

Good

Potter County, Texas · 0.3 MI E of Coulter ST · Structure no. 041880263504081

Built
2013
12 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
100 ft
1 main span
Daily traffic
822
2018 count
Owner
State
State Highway Agency

About this bridge

Slp 335 Ebfr over Dry Creek is a prestressed concrete stringer/multi-beam or girder carrying Slp 335 Ebfr over Dry Creek in Potter County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 822 vehicles a day, roughly 2% of them trucks, projected to reach 250 by 2033. The structure is 100 ft (30.5 m) long and 39 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesSlp 335 Ebfr
CrossesDry Creek
Location0.3 MI E of Coulter ST
RouteState Highway 335
StateTexas
Coordinates35.25464, -101.90939
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length100 ft (30.5 m)
Longest span100 ft (30.5 m)
Deck width39 ft (12 m)
Roadway width32 ft (9.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic822 (2018)
Projected traffic250 by 2033
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Slp 335 Ebfr over Dry Creek built?

It was built in 2013, making it 12 years old in 2025.

What condition is Slp 335 Ebfr over Dry Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Slp 335 Ebfr over Dry Creek carry?

About 822 vehicles per day (2018 count), of which roughly 2% are trucks.

How long is Slp 335 Ebfr over Dry Creek?

The structure is 100 ft (30.5 m) long with a longest span of 100 ft (30.5 m) and a deck 39 ft wide.

Who owns Slp 335 Ebfr over Dry Creek?

It is owned by the State Highway Agency.