US Bridges

FM 1719 over Draw

Good

Potter County, Texas · 1.9 MI N of Lp 335 · Structure no. 041880162401004

Built
2007
18 years old
Condition
Good
inspected September 2024
Type
Culvert
Concrete
Length
42 ft
3 main spans
Daily traffic
692
2020 count
Owner
State
State Highway Agency

About this bridge

FM 1719 over Draw is a concrete culvert carrying FM 1719 over Draw in Potter County, Texas. It was built in 2007, so it is 18 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 692 vehicles a day, roughly 6% of them trucks, projected to reach 1,380 by 2033. The structure is 42 ft (12.8 m) long. If it were closed, the detour would be 8.1 mi (13 km).

CarriesFM 1719
CrossesDraw
Location1.9 MI N of Lp 335
RouteState Highway 1719
StateTexas
Coordinates35.29109, -101.88429
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length42 ft (12.8 m)
Longest span8 ft (2.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic692 (2020)
Projected traffic1,380 by 2033
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 1719 over Draw built?

It was built in 2007, making it 18 years old in 2025.

What condition is FM 1719 over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does FM 1719 over Draw carry?

About 692 vehicles per day (2020 count), of which roughly 6% are trucks.

How long is FM 1719 over Draw?

The structure is 42 ft (12.8 m) long with a longest span of 8 ft (2.4 m).

Who owns FM 1719 over Draw?

It is owned by the State Highway Agency.