IH 40 WB over Julian/Wolfin St.
GoodPotter County, Texas · IH40 MP 68.3 · Structure no. 041880027501152
- Built
- 1966
- 59 years old, rebuilt 2021
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 705 ft
- 1 main span
- Daily traffic
- 32,302
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
IH 40 WB over Julian/Wolfin St. is a prestressed concrete stringer/multi-beam or girder carrying IH 40 WB over Julian/Wolfin St. in Potter County, Texas. It was built in 1966 and reconstructed in 2021, so it is 59 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 32,302 vehicles a day, roughly 9% of them trucks, projected to reach 61,430 by 2033. The structure is 705 ft (214.9 m) long and 59 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 40 WB over Julian/Wolfin St. built?
It was built in 1966, making it 59 years old in 2025. It was reconstructed in 2021.
What condition is IH 40 WB over Julian/Wolfin St. in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does IH 40 WB over Julian/Wolfin St. carry?
About 32,302 vehicles per day (2017 count), of which roughly 9% are trucks.
How long is IH 40 WB over Julian/Wolfin St.?
The structure is 705 ft (214.9 m) long with a longest span of 100 ft (30.5 m) and a deck 59 ft wide.
Who owns IH 40 WB over Julian/Wolfin St.?
It is owned by the State Highway Agency.