US Bridges

Dick Skinner Road over Neches River Tributary

Good

Polk County, Texas · 0.7 MI E of FM 1987 · Structure no. 111870AA0224002

Built
2017
8 years old
Condition
Good
inspected May 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
75 ft
1 main span
Daily traffic
39
2021 count
Owner
County
County Highway Agency

About this bridge

Dick Skinner Road over Neches River Tributary is a prestressed concrete box beam or girders - multiple carrying Dick Skinner Road over Neches River Tributary in Polk County, Texas. It was built in 2017, so it is 8 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 39 vehicles a day, roughly 3% of them trucks, projected to reach 39 by 2041. The structure is 75 ft (22.9 m) long and 26 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesDick Skinner Road
CrossesNeches River Tributary
Location0.7 MI E of FM 1987
RouteCounty Highway 0
StateTexas
Coordinates31.09379, -94.75462
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length75 ft (22.9 m)
Longest span75 ft (22.9 m)
Deck width26 ft (8 m)
Roadway width25 ft (7.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic39 (2021)
Projected traffic39 by 2041
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Dick Skinner Road over Neches River Tributary built?

It was built in 2017, making it 8 years old in 2025.

What condition is Dick Skinner Road over Neches River Tributary in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Dick Skinner Road over Neches River Tributary carry?

About 39 vehicles per day (2021 count), of which roughly 3% are trucks.

How long is Dick Skinner Road over Neches River Tributary?

The structure is 75 ft (22.9 m) long with a longest span of 75 ft (22.9 m) and a deck 26 ft wide.

Who owns Dick Skinner Road over Neches River Tributary?

It is owned by the County Highway Agency.