US Bridges

FM 943 over Menard Creek Relief

Good

Polk County, Texas · 8.1 MI E of SH 146 · Structure no. 111870119401004

Built
1987
38 years old
Condition
Good
inspected April 2024
Type
Culvert
Concrete
Length
33 ft
3 main spans
Daily traffic
738
2020 count
Owner
State
State Highway Agency

About this bridge

FM 943 over Menard Creek Relief is a concrete culvert carrying FM 943 over Menard Creek Relief in Polk County, Texas. It was built in 1987, so it is 38 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 738 vehicles a day, roughly 11% of them trucks, projected to reach 1,310 by 2033. The structure is 33 ft (10.1 m) long. If it were closed, the detour would be 19.3 mi (31 km).

CarriesFM 943
CrossesMenard Creek Relief
Location8.1 MI E of SH 146
RouteState Highway 943
StateTexas
Coordinates30.56956, -94.7005
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length33 ft (10.1 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic738 (2020)
Projected traffic1,310 by 2033
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed19.3 mi (31 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 943 over Menard Creek Relief built?

It was built in 1987, making it 38 years old in 2025.

What condition is FM 943 over Menard Creek Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does FM 943 over Menard Creek Relief carry?

About 738 vehicles per day (2020 count), of which roughly 11% are trucks.

How long is FM 943 over Menard Creek Relief?

The structure is 33 ft (10.1 m) long with a longest span of 10 ft (3 m).

Who owns FM 943 over Menard Creek Relief?

It is owned by the State Highway Agency.