US Bridges

RM 2886 over Draw

Good

Pecos County, Texas · 20.10 MI S of IH 10 · Structure no. 061860290501001

Built
1970
55 years old
Condition
Good
inspected November 2023
Type
Culvert
Concrete
Length
22 ft
2 main spans
Daily traffic
30
2022 count
Owner
State
State Highway Agency

About this bridge

RM 2886 over Draw is a concrete culvert carrying RM 2886 over Draw in Pecos County, Texas. It was built in 1970, so it is 55 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30 vehicles a day, roughly 7% of them trucks, projected to reach 42 by 2042. The structure is 22 ft (6.7 m) long and 35 ft wide. If it were closed, the detour would be 29.8 mi (48 km).

CarriesRM 2886
CrossesDraw
Location20.10 MI S of IH 10
RouteState Highway 2886
StateTexas
Coordinates30.64293, -102.19095
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length22 ft (6.7 m)
Longest span7 ft (2.1 m)
Deck width35 ft (10.8 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30 (2022)
Projected traffic42 by 2042
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed29.8 mi (48 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was RM 2886 over Draw built?

It was built in 1970, making it 55 years old in 2025.

What condition is RM 2886 over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does RM 2886 over Draw carry?

About 30 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is RM 2886 over Draw?

The structure is 22 ft (6.7 m) long with a longest span of 7 ft (2.1 m) and a deck 35 ft wide.

Who owns RM 2886 over Draw?

It is owned by the State Highway Agency.