US Bridges

Holbrook RD Pct 2 over Trib Walnut Creek

Fair

Parker County, Texas · 1.0 MI NE of SH 199 · Structure no. 021840AA1029001

Built
1992
33 years old
Condition
Fair
inspected November 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
45 ft
1 main span
Daily traffic
47
2019 count
Owner
County
County Highway Agency

About this bridge

Holbrook RD Pct 2 over Trib Walnut Creek is a steel stringer/multi-beam or girder carrying Holbrook RD Pct 2 over Trib Walnut Creek in Parker County, Texas. It was built in 1992, so it is 33 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 47 vehicles a day, roughly 3% of them trucks, projected to reach 128 by 2042. The structure is 45 ft (13.7 m) long and 25 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesHolbrook RD Pct 2
CrossesTrib Walnut Creek
Location1.0 MI NE of SH 199
RouteCounty Highway 0
StateTexas
Coordinates32.98489, -97.73538
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating41.2 US tons
Inventory rating24.7 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length45 ft (13.7 m)
Longest span45 ft (13.7 m)
Deck width25 ft (7.6 m)
Roadway width24 ft (7.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic47 (2019)
Projected traffic128 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Holbrook RD Pct 2 over Trib Walnut Creek built?

It was built in 1992, making it 33 years old in 2025.

What condition is Holbrook RD Pct 2 over Trib Walnut Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does Holbrook RD Pct 2 over Trib Walnut Creek carry?

About 47 vehicles per day (2019 count), of which roughly 3% are trucks.

How long is Holbrook RD Pct 2 over Trib Walnut Creek?

The structure is 45 ft (13.7 m) long with a longest span of 45 ft (13.7 m) and a deck 25 ft wide.

Who owns Holbrook RD Pct 2 over Trib Walnut Creek?

It is owned by the County Highway Agency.